BUDGET

After the complete build of the Roadway Monitoring System, the Final Budget is calculated below. Due to the urgency of receiving parts and the increasing prices across the industry, there is some differentiation in cost. In addition, the team possessed existing hardware for the build that consisted but was not limited to, tin-coated copper wires, screws, bolts, wire sleeving, and zip ties. 

Screen Shot 2022-07-26 at 12.51.17 AM.png

PROJECT TIMELINE

Screen Shot 2022-07-26 at 12.56.50 AM.png

PROPOSAL TIMELINE

Proposal Timeline.png